When we talk about renewable energy sources, it becomes impossible to leave the sun without discussion. Solar panel installation can become a trend as there are plenty of benefits that we have already discussed in the past blogs; we do not want to brag more about it. 


Here we will try to answer the number of days required for solar panels installation. Time is always important to consider when planning to make significant changes in your home or commercial spaces. The solar system is also no different. Before installing it, you must be aware of the number of days it will take. 


With the increased global population, the demand for cheaper energy sources is soaring like never before. Clean and renewable solar energy helps bridge the gap between increased electricity demand and cheap renewable energy sources. In fact, solar energy is the fastest growing energy source and most important of all. 


Various factors can impact the solar installation timeline; the following are the important ones: 

  • The chosen solar panel installation company
  • Local process and inspection process
  • Type and size of the solar system
  • Location
  • Weather, especially high wind and monsoon, affects the installation process 
  • Roof repair, in case of its need 
  • Solar panel equipment availability
  • Property characteristics

How Many Days Does the Installation Process Take?

In the following reading, you will get to know the process and give you a good idea of how long it takes. 

  • Choosing a Solar Installer 

The very first step towards going solar is choosing the right solar installer. The chosen installer helps install the system but also determines the quality and timeline for the installation process, so choose wisely. Before finalising the one, go through various profiles to make the right decision. We suggest going through at least three quotes to boost your chances of getting fair price installation services. You can pick SolarDaddy because it is a certified installer with great customer reviews and the most affordable option.

  • Site Assessment

Once you have decided to welcome solar panels at your residence, the next step is assessing your site to ensure that your site is ready and safe for solar. Here professionals will visit your place and do the roof assessment and other assessments to check whether your place is ready for solar panel installation. Sometimes what happens is that your roof might not be strong enough to hold solar panels, which results in a huge loss. If your roof is not strong enough, you need to repair it or install a new one. Once your roof gets a thumbs up, you are ready to move to the next step.   

  • System Design

Once you have completed the above two steps, the next thing is the system design, where an engineer will start designing your system based on your roof design. Various factors are considered while designing including roof type, features, electricity usage, local building code requirement, etc. Generally, it takes around 1 to 3 weeks and totally depends on your requirements and the above-discussed factors. 

  • Building and Solar Permits 

The next thing that is considered is applying for building and solar permits from the local authority. Here, the local authority's permission is the longest and most time-consuming part of the entire solar panel installation process, but again duration varies from place to place. Generally, it takes around 2 to 8 weeks. 

  • Installation   

After getting a building and solar permit from the authority, the solar panel installation is next. Once the solar company orders all parts, the installation will take around 1 to 5 days. If you have a more extensive system, then the installation process may take more time. The entire installation process is breakdown into the following tasks:

  •  Frame installation
  • Installing the panels
  • Connecting panels to the inverter
  • Inspection

Once the solar panel is installed, you can't jump to the start of the system. A local inspector will come for an inspection to check if the panel is installed correctly and up to code. This is a vital step as it is done to ensure that all installations are safe and ready to generate electricity. The inspection process may take a week, as it entirely depends on where you live and how soon the inspector can come. 

  • Utility Connection

The next and final thing is utility connection, where you must apply the local utility and request them to flip the switch to connect your system. The utility company will install a metre to calculate how much electricity your solar system will produce. The end step may take around two weeks, but the wait is worth it for a better and green planet and huge savings on electricity bills. 


Worth the Wait!

Sometimes it may take more time than expected, but the wait can be worth it. But while planning to go solar, it is vital to choose experienced and expert solar panel installation partners like solardaddy. Our expert team will guide you through the entire process and notify you about any progress or delay in the installation. You can talk to our customers to learn more about us. What's stopping you? Go green with us.

 